PSFM-1: How a Home-Built Recorder Caught the July 22 Frequency Event
On July 22, 2026, a fault on a 230 kV transmission line triggered the loss of roughly 3,800 MW of load, as data centers switched over to internal backup power. The result was one of the steepest frequency swings I’ve recorded: grid … Continue reading →
